Prompt Title: Buncefield explosion details

Created 1 year ago
Votes 0
Views 294 times
0

Prompt Detail:

arrange below on events type;Fuel Release | | Fuel Containment Measures Failed / | \ / | \ Tank Overfill (AND) Tank Rupture (OR) Process Equipment Failure (OR) / \ | / | \ / \ | / | \ Overfill Protection Failed Tank Design Flaws Explosion-Induced Instrumentation Human Error (AND) (OR) Overpressure Malfunction (OR) / \ (OR) / | \ / \ / | \ Overfill Sensor Control System / | \ Malfunction Malfunction / | \ (OR) (OR) Instrument Calibration Procedural Error \ / (OR) (OR) Tank Gauge Tank Valve Malfunction / \ / \ (OR) (OR) Sensor Failure Calibration Procedure Not Followed / \ (OR) (OR) / \ Equipment Failure Human Error Tank Valve Failure Control Valve Failure (OR) (OR) (OR) / \ Flame Impingement / \ Inadequate Maintenance Inadequate Training (OR)
avatar
anish pandey
Shared 1 prompt
Created 1 year ago

Leave a Comment