Prompt Detail:
Setting up and Configuring Enterprise Information Management (EIM) System
To establish a robust and compliant Enterprise Information Management (EIM) system, follow the below steps while adhering to industrial standards. This guide outlines the process for deploying and configuring the EIM application in a controlled manner.
Folder Structure Setup:
Create two directories, namely
IM_DATA
andIM_SETUP
, within the/Appdata/EdifecsSetups
directory.arduinomkdir /Appdata/EdifecsSetups/IM_DATA mkdir /Appdata/EdifecsSetups/IM_SETUP
Environment Variable Configuration:
Create a system variable named
IM_DATA
and set it to point towards theIM_DATA
folder.javascriptexport IM_DATA=/Appdata/EdifecsSetups/IM_DATA/
Verify the path is set correctly using the command:
bashecho $IM_DATA
Software Deployment:
Utilize WinSCP to securely transfer the EIM installer to the
IM_SETUP
directory.Unzip the EIM folder using the following command:
pythonunzip path_to_zip_file.zip
Permissions Management:
Ensure appropriate permissions are granted to the
EIM
folder and its contents:bashchmod 777 filename/dir name
Application Verification:
Navigate to the
dev
folder and execute the verification script:bash./verify-im.sh
Hostname Configuration:
Update the hostname in the configuration file to reflect the intended deployment environment.
Application Start:
Initiate the EIM application.
Upon successful deployment, copy the provided URL for future access.
Login and Configuration:
Log in to the system and modify the hostname and port settings as required. Restart the EIM application for the changes to take effect.
Standard Import:
Copy the standard files (HIPAA, X12N, ECL2, HIX, TM) from the release build to the
IM_DATA
directory. Set appropriate permissions for these standards.Start the EIM server to allow the standards to appear on the interface.
Server Integration:
Add the Linux server as a resource. Ensure successful integration by confirming its status.
TM Database Configuration:
In the TM Database section, configure the URLs for both the active and master databases. Set the trust certificate to "TRUE" if not already done. These fields are mandatory.
Additional Configurations:
Configure Enablement and GBd resources as per your requirements.
Optional: GBD Reporting and Data Storage:
If needed, configure GBD Reporting (Datamart service) and data storage settings. Provide necessary details such as admin usernames if enabling data storage.
TM Email Server:
Configure the TM email server by inputting the SMTP details.
TM Event Bus and File Domains:
Review and configure TM Event Bus and File Domains settings as necessary.
TM Global Settings:
Modify TM RMI and TM JMS settings according to your system's demands.
EAM Properties:
Set your credentials in the EAM properties.
Memory Settings:
Adjust memory settings for the TM service under Business Item Service in Transaction Management, if required.
Web App Configuration:
Modify the URL within the Tomcat Web App settings.
Configuration Review:
Review all changes made thus far.
Clean Install and Error Handling:
Perform a clean installation to uninstall any previous installations. Address errors that may arise during installation, marking manual tasks as completed.
KNOWN ERRORS:
- If encountering a port-related error, modify the port number and verify the hostname. Restart the EIM application.
- In case of "failed to start IM," terminate the Java process and restart the server.
By following these steps, you can establish a robust and standards-compliant Enterprise Information Management system tailored to your organization's needs. Always ensure that changes made adhere to industry best practices and security guidelines.